TFHS Project Information

2024

2023

2022

2021

2020

  • 2020- TFHS Building Management System Upgrade (CAPITAL PROJECT)
  • 2020- TFHS COVID-19 HVAC System Repairs and Modifications
  • 2020- TFHS Fire Alarm Control Panel Replacement
  • 2020- TFHS Roof Top #1 HVAC Unit Replacement
  • 2020- TFHS Athletic/ Arts Trophy and Display Case Reconditioning
  • 2020- TFHS Emergency Generator Testing and Operational Mapping
  • 2020- TFHS Heating System Glycol Flush
  • 2020- TFHS- Hot Water System- Mixing Valve Replacements
  • 2020- TFHS Roof Repair
  • 2020- TFHS- Science Lab Chemical Safety 
  • 2020- TFHS- Touchless Water Fountain Installation

2019

  • 2019- TFHS Fire Alarm System Repairs
  • 2019- TFHS Handicap Automatic Door Install/ Repairs
  • 2019- TFHS Emergency Micro-Grid Project
  • 2019- TFHS Pool- Chemtrol Control Unit Replacement
  • 2019- TFHS Pool- Special Needs Access Lift Replacement

2018

  • 2018- TFHS Hot Water Heater Replacement (800,000 BTU x 2)